Swedish Medical Center First Hill East Tower – Temp & Permanent Power Design
On site response to roof level freeze event that caused water intrusion into critical electrical distribution. Coordination of on-site resources to provide temporary power to seven different automatic transfer switches, and design temporary alternative distribution systems for busway serving multiple levels of patient care. Lead data collection efforts of electrical distribution equipment impacted by water and support Owner insurance claims. Design and lead replacement efforts in 24/7/365 facility, breaking work into five separate phases to…
Read MoreSwedish Medical Center Cherry Hill OR Renovation Project
On site response to weather initiated water intrusion event into Operating Rooms on Level B, which impacted electrical building infrastructure and clinical engineering equipment in four operating rooms, including one IR and one Hybrid OR. Engineering support to catalog and document electrical building infrastructure and clinical engineering equipment in the spaces saturated by water intrusion event. Support efforts include; status tracking, vendor re-certification, and managing recommendations for replacement or refurbishment, and supporting documentation to Owner…
Read More