Swedish First Hill Campus SCL Radial Feeder Replacement Project

First Hill Master Plan

Due to the failure of one existing Seattle City Light service feeder normal power was interrupted to the East Tower main service, EBD Services provided initial emergency response services to coordinate with Seattle City Light for the restoration of normal power to the East Tower utilizing an option feeder. In support of an extended outage required by Seattle City Light to safely repair the utility feeder system, EBD Services developed a comprehensive temporary power design…

Read More

Seattle Children’s Hospital Forest B | Building Care

This 485,500 square foot, eight-story inpatient diagnostic and treatment facility is the new front door to Seattle Children’s campus and the second phase of a one-million-square-foot campus expansion to provide the most advanced care for young patients. Key program elements included surgery, sterile processing, cancer & blood disorder clinic, lab, outpatient pharmacy, imaging, and inpatient bed floors. EBD scope of services included construction phase and occupancy/warranty phase Project Management/Owner Technical Advisor for electrical and mechanical…

Read More

Swedish First Hill Campus, North Tower | Block 95 Project

FH North Tower-Block 95

1,600,000 square foot expansion on the Swedish First Hill campus including the North Tower and Block 95. North Tower is a 742,000 gsf, 13-story Hospital Tower with three levels of below grade parking & support floors featuring operating suites, sterile processing, imaging, support spaces, and emergency generator plant. Block 95 is a 930,000 gsf, 17-story Medical Office Building with two levels of hospital support functions including loading dock and materials management, three levels of outpatient…

Read More

UWMC McMurray Urology Medical Clinic

EBD Services provided electrical design engineering services including expansion of the existing facility electrical distribution system, new state-of-the are lighting control system, and technology infrastructure in support of a 15,000 square foot renovation and expansion of the existing clinic.  This project successfully integrated three different service lines into one comprehensive facility providing kidney stone treatment, general urology, and pelvic health services. 

Read More

Providence St. Peter’s Hospital Imaging Survey

Project scope included the evaluation of mechanical and electrical services supporting; 2 CT rooms, 2 Cath Labs, and 2 Angiography Rooms in an existing Hospital.  The existing functional program for clinical services and procedures performed was reviewed against the existing MEP infrastructure.  Recommendations were provided that helped the Owner make decisions about clinical services to include in the functional program and capital project planning for future upgrades.        

Read More

Swedish First Hill UPS Replacement Project

Project scope included the electrical design for the replacement of an end-of-life age Central UPS and associated battery cabinet with new equipment.  Design included evaluation of existing infrastructure and existing space so that replacement equipment fit in the space allocated and met all Code required and Facilities required working clearances.  Engineering included review of existing distribution and new Central UPS equipment for selective coordination, available fault current, and arc flash.

Read More